COMPLIMENTS LETTER PROJECT:   INSTALL 01 HANGER SHACKLE OF DRAPE CHAIN NO.8 ON ANCHOR LEG CHAIN NO.8 OF TBVN MOORING SYSTEM AT SU TU DEN OIL FIELD WITH WATER DEPTH IS 48M
            
            
                
                    Date posted: 
                    10/12/2024  
                
                
                    
                 
    - 
    
PROJECT: INSTALL 01 HANGER SHACKLE OF DRAPE CHAIN NO.8 ON ANCHOR LEG CHAIN NO.8 OF TBVN MOORING SYSTEM AT SU TU DEN OIL FIELD WITH WATER DEPTH IS 48M
     
    - 
    
CLIENT: CL JOC
     
    - 
    
TIME: 31st OCTOBER, 2024
    